HYDROCARE

Smart Water Distribution & Chlorination Management System

Demo PIN: 1234

డాష్‌బోర్డ్ అవలోకనం

Village Water Supply Unit • Live SCADA View
CONNECTING Last Update: -- Admin
OHT-01 Water Level
78%
Normal
Available Water
31.2 KL
Capacity 40 KL
Main Pump
RUNNING
3 HP Pump
Residual Chlorine
0.25
mg/L Target

Live Water Level

78%
Sensor Distance176 cm
Tank Capacity40 KL
Available Volume31.2 KL
OverflowSAFE

System Health

LoRa LinkONLINE
GSM BackupSTANDBY
Cloud SyncCONNECTING
Flow SwitchWATER FLOW
Battery Backup91%
Panel DoorCLOSED

24-Hour Water Level Trend

DPD & Chlorine Trend

Village Multi-Tank Network Map

Pump House3 HP • Flow ON
OHT-0178% • 40 KL
OHT-0252% • Dual Inlet

తదుపరి దశలో GPS coordinates ఆధారంగా నిజమైన Google/OpenStreetMap view జోడించవచ్చు.

OHT-01

78%
Volume31.2 KL
StatusFILLING

OHT-02

52%
Volume20.8 KL
StatusSTANDBY

Overflow Monitoring

OHT-01SAFE
OHT-02SAFE
Last TestToday

Tank Configuration

Main Pump
ON
3 HP
Runtime Today
3h 26m
Normal
Pipeline Pressure
2.6 bar
Stable
Flow Status
ON
HFS-25

Three Phase Monitoring

R PhaseOK
Y PhaseOK
B PhaseOK
Phase Failure RelayHEALTHY

Pump Protection

Dry RunNO FAULT
OverloadNO FAULT
Starter FeedbackRUNNING
Emergency StopREADY
Target Dose
200 ml
Today
Injected
0 ml
Pending
Dosing Pump
OFF
10 LPH @ 4 kg/cm²
Chemical Level
74%
60 kg Tin

Automatic Dosing Plan

Calculation ready.

Mandatory Safety Interlocks

Water Flow InterlockENABLED
10-second Start DelayENABLED
Maximum RuntimeENABLED
Low Chemical FloatENABLED
Anti-Siphon Valve / NRVFIELD CHECK
Independent Timer RelayRECOMMENDED

DPD Test Entry

Enter DPD value and calculate.

Decision Rules

DPD = 0.00RETEST + INSPECTION
Below TargetINCREASE LIMITED %
Within RangeMAINTAIN
Above TargetREDUCE LIMITED %

ఇది prototype recommendation logic. Field validation, operator confirmation మరియు approved chlorination SOP అవసరం.

Critical Alerts

Three-phase failure → Operator + Engineer + Electrical Team
Dosing maximum runtime exceeded
Pump ON but water flow not detected
Tank overflow detected

Warning Alerts

Chemical level low
Battery backup below 25%
Panel door opened
LoRa offline — GSM fallback active

Daily / Weekly / Monthly Reports

DateTankWater SuppliedPump RuntimeChlorine DoseDPDDecisionStatus

Project Settings

Integration Status

ESP32 APIPENDING
FirebasePENDING
SMS APIPENDING
IVRSPENDING
HostingREADY